From: route@monster.com
Sent: Friday, August 19, 2016 10:53 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Date: June 13, 2016 Richard
M. Leonard 15807 Taut Court Crosby, TX. 77532 Email: richard.leonard.jr@live.com Home Phone: 281-328-6511 Mobile Phone: 832-969-6255 Position: Lead
Planner/Scheduler Education:Quality
Control, San Jacinto College, Pasadena, Texas.
Continuing Education, Wallace College, Dothan, Alabama.
Continuing Education, Troy State University, Dothan, Alabama. Courses:
Advanced Cost and Schedule Control - By AACEI P3e/c
& P5 Course by Commint. P6 Course by BP‘s North American SME. Schedule Risk Analysis using Pertmaster for P6. Affiliations: American Association of
Cost Engineering (AACEI) Linked-in Project Controls
Professionals General Summary:
Work Summary - I have thirty
years of engineering, procurement and construction (EPC) experience.
I’ve worked in the ‘Home Office’ preparing schedules for all project
phases ranging from conceptual to commissioning. I’ve also working on
numerous new construction sites supporting management on ‘Grass Roots’ and
‘Expansion’ projects. I also have experience assisting clients with
‘self-perform’ construction management and turnarounds. These
assignments included working as the Project Controls Manager, Cost Engineer,
Construction and Turnaround Planner/Scheduler. Prior to working in project
controls I
worked eleven years as a pipefitter, welder, and welding inspector on both
new construction and capital projects. Industry Summary - Most of my
experience has been in the oil and gas industry. But, I also have
experience in chemical and plastics production, copper and phosphate mining
facilities, steel making capital projects, pharmaceutical manufacturing
sites, office building construction and blast proofing of existing structures
as well as industrial security enhancements. People Skills - I have an
excellent understanding of engineering and construction deliverables required
for completing many types of industrial projects. I’m skillful at
conducting interactive planning sessions using the white-board or post-it
note method. I interact easily with engineers, buyers, contract
administrators and project managers. I relate well with construction
coordinators, superintendents and site managers and have a good understanding
of overall operating unit systems related to start-up and shutdown.
I’ve always been able a good rapport with other project controls
professionals and always maintain a professional demeanor in stressful
situations. Computer Skills - I'm skilled with
the use of the latest industry standard scheduling software. This includes
Primavera (P6 ver. 8.3) and MS Project 2010. I’m proficient with MS
Office software (Adobe, Excel, Word, Outlook, Access, Power Point). I
have experience using SAP and JD Edwards cost and procurement programs.
I also have experience using client specific databases for managing cost,
progress measurement and electronic drawings. Representative
Projects: ·
Turnaround
Planner/Scheduler for a Pipestill Unit maintenance turnaround at the
ExxonMobil Refinery in Baytown, TX. The general scope included a
detailed shutdown and startup schedule, tower tray repairs and packing
replacement, furnace inspection and repairs, exchanger cleaning and
replacements, cooling tower cleaning and repairs as well as installation of
project piping and tie-ins. ·
Turnaround
Planner/Scheduler for making final tie-ins on a large expansion project at
the ExxonMobil Refinery in Baytown, TX. The multi-unit shutdown included a
detailed shutdown and startup schedule, along with an all-inclusive manpower
plan. The replacement of several towers with foundation modifications,
reactor tray revisions, catalyst replacement, pump rebuilds, exchanger
cleaning/testing (including re-rating), foundation modifications and 110
piping tie-ins along with 500 (+/-) field welds. ·
Lead Planner/Scheduler
for design and construction of an “Arctic Class” drilling rig. Prepared
schedules for numerous design and construction scenarios for a state of the
art “Arctic Class” onshore drilling rig designed to exceed onshore drilling
depth records. Also, prepared and monitored the refurbishment schedule
for a barge type drilling rig in port, as well as a schedule for relocation
and upgrade of an existing drilling in the Middle East. ·
Project
Controls Specialist for construction management of a new dock and storage
tank facility for Intercontinental Terminals Company (ITC) in Pasadena,
Texas. Developed a WBS for non-existent cost reporting and scheduling
structure for a “self-perform” EPC construction management project.
Provided cost and schedule requirements for contractor bid packages.
Prepared overall site schedule and contractor bid schedules. Setup cost
reporting structure that aligned with the existing JD Edwards accounting
system. Funding was eliminated for project controls. ·
Principal
Specialist Planner/Scheduler for a proposed grassroots onshore LNG plant in
Tanzania, Africa. Provided bid package schedules for various locations
along with bidder’s schedule requirements and WBS structure for numerous EPC
bid packages. ·
Senior
Planner/Scheduler for numerous refinery small and mid-cap projects at Jacobs
Houston, TX office. Prepared and updated various levels of EPC schedules for
small and mid-cap projects. Prepared proprietary level one monthly schedules
and critical path reports. Provided proposal and work around schedules
when needed. ·
Shutdown
Planner/Scheduler for Eastman Chemicals “Polymers Shutdown” at the Kingsport,
TN. facility. Provided detailed shutdown schedule based on maintenance
work orders and capital projects. The schedule was organized by the
clients WBS in SAP and was resource loaded by work group for each
shift. Conducted daily meetings with operations and site management
during the shutdown. Provided daily critical path analysis, progress
reports and resource requirements for the next two shifts. ·
Senior
Planner/Scheduler for the BP refinery “Flare Gas Recovery Project” at the
Texas City, TX. Site. Worked with the resident engineering contractor
to provide an integrated level four (detailed) construction and commissioning
schedule. This effort also included three sub-projects that needed to
be completed and started up prior to commissioning the FGR project. I
conducted weekly schedule update meetings and provided a three week
look-ahead schedule to support the weekly reporting cycle. I also
provided a monthly critical path analysis and Level 1 schedule for the
monthly reports. ·
Senior
Planner/Scheduler for the Non Road Diesel - NRD (OSBL) Project at Exxon Mobil
in Baytown, TX. Provided level four (detailed) construction schedule.
Conducted weekly schedule update meetings. Provided Monthly critical
path analysis and progress reports, along with work around/recovery plan
schedules when needed. ·
Lead
Scheduler at the Motiva, Crude Expansion Project (Power Station 4) in Port
Arthur, TX. Worked three months in the home office on the engineering
schedule. Then moved to the site to streamline the existing construction
schedule and monitor progress. Prepared daily work schedules. Provided
work-around/recovery schedules when need. ·
Project
Controls Lead at the Shell Refinery in Deer Park, TX. Assumed
responsibility of the construction management schedule and cost reporting for
a new six story administration building and parking area. Reviewed and
approved the general contractor’s invoice and construction progress payments,
as well as prepared data for client’s monthly cost and progress report. ·
Lead
Planner/Scheduler at
the BP Refinery in Texas City,
TX. Worked with BP production planners and Unit Supervisors to prepare
and maintain commissioning schedule for startup of the refinery and chemical
plant after hurricane Rita. Integrated schedules from turnaround,
maintenance and capital projects with operations startup activities.
Prior to that I prepared and maintained numerous EPC schedules for small and
mid-cap projects in the refinery and chemical plant. Conducted
interactive planning sessions at various stages of projects. Worked
closely with engineers and construction coordinators to prepare, and monitor progress. ·
Planner/Scheduler
for Eli Lilly T100 - 5th Unit of Capacity Project in Lafayette, IN.
Worked with Cincinnati office engineer's and lead designer's to develop level
2 construction schedule prior to mobilization. Continued to provide
additional detailed construction schedules as engineering advanced.
Project scope was reduced by Eli Lilly corporate office. Construction
program management team was released. ·
Turnaround
Planner/Scheduler at ExxonMobil Refinery in Baytown, TX. Worked with
Exxon Mobil turnaround planners, execution supervisors, operations personnel
and in-house contractors to plan, estimate and prepare detailed resource
loaded schedules. Worked with client and contractors to develop a
comprehensive manpower plan. Assisted with logistics of turnaround
(heavy equipment, material and tool's). Input progress daily and
published look-ahead schedules. Monitored progress, productivity,
critical and sub-critical path. ·
Planner/Scheduler
for Bayer’s Plastics Expansion Project in Baytown, TX. Worked with
engineering discipline leads to prepare detailed engineering schedules and
cost reports for five expansion projects. Prepared progress curves and
manpower forecasts by discipline for each project. Updated schedules weekly and issued for project team use. ·
Planner/Scheduler
for Hovensa’s FCC Unit shutdown in St. Croix, USVI. Reworked previous
T/A manloaded schedule prior to start of 2000 T/A. Developed
work-around schedules with plant maintenance planners and other specialty
contractors as needed. Assisted area superintendents, plant inspectors,
maintenance supervisors and unit engineers with planning and execution of
work. ·
Project
Controls Leader for Bayer’s “Makrolon” Shutdown in Baytown, TX.
Developed and monitored EPC schedules for forty three capital projects which
were completed in a thirteen day shutdown. Continuously monitored
contractors progress and critical path during turnaround. Reported
progress and system turnover status at daily meetings. After completion
of T/A, I assisted the Corporate Engineering Department managers with
development of a long range engineering manpower forecast for seven major
upcoming expansion projects at the Baytown facility. ·
Planner/Scheduler
for construction management of Shell-Norco’s Olefins Debottlenecking Project
in Norco, LA. Compiled all sub-contractors schedules into a master
project schedule. Monitored each contractor’s progress. Held
coordination meetings with multiple lump sum contractors twice weekly in
order to manage demo, refurbishment and new construction of an existing
Ethylene unit. Assisted project/field engineer’s with system turnover
and start-up coordination at end of project. ·
Project
Controls Manager for new construction of Kerr-McGee’s TiO2 Pigment
Expansion Project in Hamilton, MS. Managed various levels of schedule
development. Coordinated integration of cost and schedule.
Supervised cost reporting and documentation of changes. Prepared weekly
and monthly cost/schedule analysis reports. Prepared backup for monthly
invoices. ·
Planner/Scheduler
for ongoing capital projects at Bethlehem Steel in Baltimore, MD.
Prepared capital appropriations schedule during conceptual phase of
projects. Prepared detailed construction schedules as the engineering
developed. Updated project schedules weekly for review with Bethlehem’s
management team and the capital work force supervisors. Worked with
Bethlehem scheduler to issue manpower projections on monthly basis for 50+
projects. ·
Planner/Scheduler
for construction management of Genetics Institute’s Suite “B” Project in
Andover, MA. Developed fully integrated engineering, procurement, and
construction schedule with the home office scheduler in Cincinnati.
Issued proposal schedules for 35 sub-contracts. Monitored all sub-contractors
scheduled progress. Held weekly schedule/coordination meetings.
Performed continuous analysis to manage “Flash Track” project working days
and nights. Started site work when engineering was only 15% complete. ·
Cost
Engineer/Scheduler for construction management of FMC’s agricultural products
plant expansion in Baltimore, MD. Developed construction schedule and
client specific progress reports in order to monitor sub-contractors daily
progress. Multiple outages were required for modularized unit
installation with numerous tie-ins to existing piping, electrical and control
systems. Work had to be accelerated by two months in order to meet client’s
seasonal product sales due to a fire and lengthy startup of the modified
facility. ·
Planner/Scheduler
for construction management of a grass root chemical plant in Augusta, GA.
for International Flavors and Fragrances. Monitored sub-contractors
schedules and measured progress. Updated and issued project schedule
for use at weekly schedule/coordination meetings. Prepared weekly
progress report for contractors. Monitored piping erection and testing
progress at the iso and system level on a daily basis at project completion
in order to assist local contractor with meeting expected finish date. ·
Planner/Scheduler
for fast track construction of a grass roots Ethylene Plant at Westlake
Petrochemicals in Sulphur, LA. Developed prioritized construction
schedule with field need dates for all equipment and commodities.
Included detailed detailed man-loading. Worked with the home office
planner in Houston to merge the engineering, procurement and construction
schedule prior to mobilization. Construction started when design was
28% complete. ·
Lead cost
Engineer/Scheduler for construction of a phosphate mining facility for CF
Industries, Inc. in Bartow, FL. Maintained existing construction
schedule. Developed client specific cost and quantity tracking
databases for all disciplines. Prepared weekly labor analysis, progress
curves and productivity charts. Supervised cost reporting and
forecasting. ·
Planner/Scheduler
for construction management of an Electrorefinery at Cyprus Miami Mining
Corp. in Globe, AZ. Provided proposal schedules for multiple lump sum
bid packages, evaluated contractors proposal schedules for logic, duration,
and proper manloading. Compiled and integrated all schedules into
master project schedule. Assisted with development of turnover packages
and startup of Electrorefinery. ·
Planner/Scheduler
for construction of a Hydrotreater and Utilities units at Koch Refinery in
Corpus Christi, TX. Developed schedules for specific unit’s, tracked
progress, coordinated construction effort with other area Planners.
Worked closely with area superintendent on manpower planning and progress
tracking. Provided turnover and startup schedule at completion. ·
Cost
Engineer/Scheduler for construction of a Catalyst Demetallization Unit for
Coastal Refining Company Inc. in Wichita, KS. Tracked schedule
progress, collected and reported cost to the home office, prepared labor
analysis and weekly progress report. Prepared turnover schedule at
completion. ·
Planner/Scheduler
for construction of a recovery boiler for Gulf States Paper Company in
Demopolis, AL. Developed schedule, tracked progress, prepared labor and
cost performance reports. Assisted programmers with development of new
progress measurement database. ·
Planner/Scheduler
for rebuild of a recovery boiler for Stone Container Corporation in Florence,
SC. Developed and tracked hourly schedule for replacement of
superheater, economizer, piping and electrical modifications to existing
boiler. Included three months of pre-outage work and 30 day (24/7)
outage. ·
Planner/Scheduler
for replacement of two recovery boilers for Georgia-Pacific in Cedar Springs,
GA. Developed totally integrated project schedule with other
contractors. Included engineering, procurement, demolition, erection
and startup of each boiler. Assisted prime contractor and engineering
company with integration of all sub-contractors work plans into the master
schedule. ·
Turnaround
Planner/Scheduler for annual shutdown of the 536 Crude Still at the Lyondell
refinery in Houston, TX. Prepared shutdown schedule and monitored
progress of maintenance and capital improvements. ·
Planner/Scheduler
for routine maintenance of the Dow Chemicals facility in La Porte, TX.
Ordered materials and scheduled appropriate maintenance personnel and or
specialty contractors on a daily basis in order to maintain on going plant
operations. Worldwide
Turnaround Management2014 - Current Turnaround
Planner/SchedulerFeb. thru Jan. Parker
Drilling2013 – 2013 Engineering
Planner/SchedulerApr. thru Dec. KAP,
Knowledge and Performance2013 - 2013 Project
Controls SpecialistJan. thru Apr. Kellogg,
Brown & Root (KBR).2012 - 2013 Principal
Specialist Planner/SchedulerJul. thru Dec. Jacobs
Engineering2001 - 2012 Lead
Planner/Scheduler
CDI
Engineering2001 - 2001 Project Controls
Specialist (Project Cancelled) Jacobs
Engineering2000 - 2001 Turnaround
Planner/Scheduler(3 Month T/A) CDI
Engineering1999 - 2000 Project Controls
Specialist(6 Month T/A) Jacobs
Engineering1996 - 1999 Planner/Scheduler,
Cost Engineer ABB
Lummus Global1995 - 1996 Construction
Planner/Scheduler(6 Months) Jacobs
Engineering1991 - 1995 Planner/Scheduler,
Cost Engineer Sunland
Construction Company.1989 - 1991 Planner/Scheduler
Mundy
Construction Company.1981 - 1989 Pipefitter/Welder and
Maintenance Planner Brown
& Root Construction1979 - 1981 Pipefitter
and Material Controls Brown
& Root Construction1975 - 1979 Pipefitter
Helper and Field Material Expeditor Page 1 of 5 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|